Delivering at Scale for a Landmark UAE LNG Project
Successful execution of large and complex LNG projects depends on more than engineering excellence. EPC contractors also require reliable supply-chain partners with the technical expertise, product range, quality assurance, and logistical capability to deliver critical materials at scale.
Gerab is proud to have contributed to a major LNG project in the UAE by supporting its extensive piping requirements with a comprehensive range of butt-weld fittings.
The fittings shown represent only a glimpse of Gerab’s overall supply scope for this large-scale project:
• More than 50,000 BW fittings
• Sizes ranging from ½ inch to 76 inches
• Over 23,000 tonnes of material supplied for the project
The LNG facility will have a production capacity of 9.6 million tonnes per annum and is planned to become the first net-zero LNG facility in the Middle East.
This achievement demonstrates the strength of Gerab’s Global EPC Team, whose core capability lies in supporting large-scale, technically demanding, and complex energy projects through dependable sourcing, coordinated project execution, and reliable global supply.
Another important milestone reinforcing Gerab’s position as a trusted supply-chain partner to EPC contractors and the global energy industry.